Plans, Reports and Studies
 
  • IMPORTANT! Two new report documents have just been posted on this page. 
  • The first new one is the "Dixie CTI Dixie Coordinated Transportation Implementation Tool", or more simply, the CTI Tool.  The Dixie CTI Tool is an outgrowth of the Dixie MPO Coordinated Human Services Transportation Plan completed in 2007.  The tool  identifies strategies that can be used to further the coordination of transportation efforts in the MPO area. It also describes the development and the recommendations of the process that was used to develop thirteen strategies aimed at advancing.
  • The second one is the "Dixie Regional Communications Study (DRAFT)". The primary purpose of this document is to present the overall architecture and high-level design of the telecommunication system that will be used to expand the CommuterLink Advanced Traffic Management System (ATMS) into the Dixie / Saint George metro area.    A few years ago the Dixie MPO completed an ITS Architecture study.  In furtherance of that study the MPO contracted with Transcore to complete an ITS Communication Plan.  The document identifies existing ITS infrastructure and proposes additional infrastructure for the purpose of meeting our ITS needs in the future.  An interactive PDF file Map is also provided that you can click on/click off specific layers.
To view these two newly posted documents, please scroll down to the items tagged:  "JUST POSTED! on this page.

     Current  Plans    

Dixie MPO:

MPO Regional Transportation Plan  PDF file (moderately sized 5.35MB compressed/reduced print quality - better for dial-up Internet users)
MPO Regional Transportation Plan   PDF file (same as above but larger 11.66MB, higher quality printing- better for broadband Internet users)
Coordinated Human Services Transportation Plan  PDF file (1.32MB)

    
Utah Department of Transportation:

Utah’s Unified Transportation Plan 2007-2030  Web Link

Previous  Plans
Interim Long-Range Plan   PDF file (5.63MB)
2003 Short Range Transit Plan  PDF file (637KB)

Reports  &  Studies

JUST POSTED!     Dixie Regional Communications Study (DRAFT)   PDF file (5.74MB)          Interactive Map that goes with the Study   PDF file (1.44MB)      
  UDOT I-15 Washington County Corridor Study  Web Link
UDOT Eastern Washington County Transportation Study  Web Link
Dixie Regional Intelligent Transportation System (ITS) Architecture Final Report PDF file (1.84MB)                      
                                ITS Architecture Executive Summary (for document above)  PDF file (282KB)
Year 2000 Traffic Model Calibration Report  PDF file (5.52MB)
Western Corridor North Study PDF file (7.65MB)
Western Corridor South Study PDF file (moderately sized 4.45MB compressed image quality - best choice for dial-up Internet users)
Western Corridor South Study PDF file (same as above but larger 18.99MB, uncompressed high quality - best for broadband Internet users)
  Western Corridor South Study  Video Presentation (12.0MB Windows Media Video (WMV) format - best for broadband Internet users)

Other Documents
JUST POSTED!   Dixie CTI Dixie Coordinated Transportation Implementation Tool PDF file (7.14MB)
Hinkley Drive Doc PDF file (10.46MB)

Southern Parkway Phase III Documents

08-05-09 DTAC Meeting Southern Parkway Horrocks Draft Report.pdf  PDF file  (3.90MB)
06-03-09 DTAC Meeting Southern Parkway Horrocks Presentation.pdf  PDF file  (2.06MB)
05-06-09 DTAC Meeting Southern Parkway Horrocks Presentation.pdf  PDF file  (2.84MB)
04-02-09 Future Roads Access Evaluation 2.pdf  PDF file (460.30KB)
Washington Fields Road Option 1A – Property Owner’s Alignment  PDF file (460.30KB)
04-01-09 Southern Parkway Horrocks Presentation.pdf  PDF file (2.78MB)
03-23-2009 Roadway Concepts on Airport Parkway Development Property-Tyler Hoskins.pdf     PDF file (734.02KB)
03-04-2009 Southern Parkway Phase 3 Transportation Study Presentation.pdf    PDF file (1.01MB)
02-10-2009 Southern Parkway Phase 3 Transportation Study   PDF file (608.91KB)
South Mountain Plan.pdf    PDF file (775.62KB)
Roadway Plan 01-21-2009 and CoverLetter.pdf    PDF file (1.07MB)
East and West Airport Master Plan Study    PDF file (26.57MB)    NOTE: Very Large File!
Southern Parkway Funding, Financing Presentation - December 17, 2008 Task Force Meeting PDF file (2.74MB)


Webmaster note:  Documents are presented in PDF format and require Adobe Acrobat Reader to view or download and install the free FoxIt PDF viewer.


Home
About the MPO
MPO Mission
MPO Staff Dixie Transportation Executive Council Dixie Technical Advisory Committee
Meetings and Agendas Transportation Improvement Program Reports and Studies Transit, Bicycles and Pedestrians Maps Traveler Information
Dixie MPO Member Jurisdiction's Websites Vision Dixie Five County AOG Website Links to Other Agencies